nexgenstone.com.au
nexgenstone.com.au
  • Home
  • WHY NEXGEN?
  • our RANGE
  • CUSTOMER SUPPORT
    • FAQ
    • HOW TO ORDER
    • CARE & MAINTAINANCE
    • WARRANTY
    • REQUEST CHIP REPAIR
    • SITE READINESS
    • HOW TO DO SUBSTRATE
  • Contact
  • More
    • Home
    • WHY NEXGEN?
    • our RANGE
    • CUSTOMER SUPPORT
      • FAQ
      • HOW TO ORDER
      • CARE & MAINTAINANCE
      • WARRANTY
      • REQUEST CHIP REPAIR
      • SITE READINESS
      • HOW TO DO SUBSTRATE
    • Contact
  • Sign In
  • Create Account

  • Bookings
  • My Account
  • Signed in as:

  • filler@godaddy.com


  • Bookings
  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • Home
  • WHY NEXGEN?
  • our RANGE
  • CUSTOMER SUPPORT
    • FAQ
    • HOW TO ORDER
    • CARE & MAINTAINANCE
    • WARRANTY
    • REQUEST CHIP REPAIR
    • SITE READINESS
    • HOW TO DO SUBSTRATE
  • Contact

Account


  • Bookings
  • My Account
  • Sign out


  • Sign In
  • Bookings
  • My Account

SITE READINESS FOR KITCHEN INSTALLATION

We are thrilled to be launching state of the art NexGen surface boasting of Vitrified Compact surface technology. 


It is important to read the below information carefully as this very important part from your side to ensure a smooth end to end process.

DESIGN CONSIDERATIONS

 

At NexGen , we believe that the kitchen is the heart of the home. That's why we are committed to delivering exceptional benchtops that transform your space into a beautiful, functional, and inviting area. Our talented team will work closely with you to bring your vision to life. 

Before one of our qualified professionals visits your home to measure up - it is important to be aware of the below 

  1. Maximum length of bench without a join is 3200 mm ( Subject to site assessment )
  2. Joins in stone benchtops are at stonemason's discretion.  
  3. Any change of direction ( L Shape ) would need a join.
  4. Maximum overhang without additional support is 300 mm.

FOR A SUCESSFUL MEASURE - PLEASE ENSURE THE BELOW

 

  • All Cabinetry must be installed including end panels. Secured & level.
  • Cabinetry level tolerances is maximum 3mm over 3 meters continuous run.
  • Walls plastered and prepared.
  • Any item to be fitted into the benchtop must on site and be in position, however not connected. Example if replacing your cooktop & Sink , the new cooktop and sink must be onsite. 
  • When replacing an existing bench top, the old benchtop must be removed before measure.
  • The customer or an adult decision maker needs to be onsite to confirm all details of the intended benchtops.
  • If purchasing a 40mm benchtop, a full substrate needs to be installed. See Substrate Section on how to install a substrate.

BEFORE INSTALLATION

 

  • Complete all works as discussed during site assessment to ensure there are no delays during installation.
  • DO NOT BOOK any post bench installation trades ( plumbers / electricians ) until your benchtops are fully installed to your satisfaction. In an unlikely event of delays in completing you benchtop installation , Petra Global or any of its subcontractors will not be responsible for any costs associated with rebooking these trades.
  • On the day of installation , allow clear & easy access to our installation team. Pets & children must be kept away while our installation crews are onsite. 

POST INSTALLATION

 

  • The customer will be asked to sign a completion statement at the end of installation. You will have an opportunity to provide any feedback that you may have regarding the installation.
  • The installers will leave the site clean & tidy.
  • Do not touch the benches for 24 hours post installation. This allows the glue to cure properly.
  • Once the installation is completed to your satisfaction , you can book your post installation trades if you are not getting a splashback from Petra Global.
  • If your are also getting a splashback through Petra Global , you will hear from us within 24 hours of job completion to book your splashback measure. Please do not book any trades ( Including plumbers / electricians) until we complete a site assessment for splashback. Please discuss with the splashback measurer if appliances can be connected before the splashback is installed.
  • For full details on how to care for y our NexGen benches , please visit care & maintenance section.

Copyright © 2024 Petra Global Pty Ltd - All Rights Reserved.

  • Home
  • FAQ
  • About Us
  • DOWNLOADS

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept